Railway Footbridge Removal Starts; Station Train Services Halted
The removal of the footbridge at Hampden Park station in East Sussex has commenced, and train services are currently suspended. This essential refurbishment will last until mid-April, disrupting normal operations.
Details of the Footbridge Removal
Network Rail has undertaken the project to ensure safety and longevity. The footbridge is being removed and refurbished this weekend with the aid of a crane. During this time, there will be no access to cross the tracks within the station.
Impact on Train Services
- No trains will be running through Hampden Park station today, February 8.
- Replacement bus services are available between Polegate, Eastbourne, and Hastings.
- Passengers are directed to use a nearby level crossing for platform access.
Travelers are advised to allow extra time to navigate the station. Tom Easdown, Southern Rail’s head of stations, noted that due to the proximity of trains, the level crossing barriers may be down when trying to cross.
Refurbishment Details
The refurbishment is crucial as the current paint system has reached its end of life. The footbridge will be entirely recoated with a new, durable protective covering. This new coating is expected to last at least 15 years.
Upgrades and Improvements
- Replacement of stairs and decking with slip-resistant, durable materials that can last up to 25 years.
- Strengthening work to ensure structural soundness.
- Installation of new handrails and safety mesh to prevent hazards.
- Accessibility enhancements including tactile paving for visually impaired passengers.
Overall, the ongoing footbridge refurbishment at Hampden Park station is a significant improvement for the local community. Passengers should plan their journeys accordingly as the work progresses throughout the coming weeks.