B.C. Island Bridge Damage Delays Reopening Schedule

ago 2 hours
B.C. Island Bridge Damage Delays Reopening Schedule

A bridge crucial for access to a Metro Vancouver island community has been severely damaged following a collision with a tugboat. The Westham Island Bridge, which opened in 1909, has been closed to vehicle traffic since the incident occurred on January 23, 2026.

B.C. Island Bridge Damage Delays Reopening Schedule

The tugboat, named Quadrant Partner, struck the wooden deck of the single-lane truss bridge, resulting in significant damage beyond initial assessments. As a result, TransLink, the region’s transit authority, has reported that the previously anticipated repair timeline has been extended indefinitely.

Assessment and Investigation

Officials from TransLink have announced that crews will conduct thorough surveys and evaluations of the bridge’s condition. The Transportation Safety Board of Canada is also investigating the incident, which originated in Coquitlam, where the tugboat is registered.

Impact on Community Services

Since the accident, the bridge has only been accessible to pedestrians. Shuttle services are being provided to assist residents on the other side of the bridge, but emergency services have been affected due to the closure.

Quote from TransLink

TransLink has acknowledged the importance of the issue, stating, “We know residents and businesses need certainty, and we don’t want to provide a timeline until we can stand behind it. Safety will continue to guide every decision as we move forward.”

Historical Significance

  • Opened: 1909
  • Location: Westham Island, B.C., south of Vancouver
  • Features: Provides access to farms, a winery, and a bird sanctuary

The situation remains fluid, and photographs shared on social media reveal the extent of structural splintering beneath the bridgeway. As assessments continue, residents await further updates on the bridge’s repair schedule.